What Sacramento Homeowners Say About Lodgewick ADU Sacramento
Reviews matter in ADU construction because the work happens on your property, over weeks or months, with crews coming and going. A good review tells you what actually happened after the contract was signed. That’s the real test. We earn ours by writing the price down before we start, showing up when we say we will, and putting a written guarantee on every build. That’s The Kingswell Way, and it’s been our standard in Sacramento since 2010.
Recent Reviews

“We converted our detached two-car garage in Tahoe Park into a one-bedroom ADU for my mother-in-law. Lodgewick gave us a written price that didn’t budge from start to finish, and the crew left the driveway cleaner than they found it every single day. She moved in three weeks ago and couldn’t be happier.”
Ernesto R. – Tahoe Park, Sacramento
“I’d been getting quotes for a backyard cottage for two years and nobody would give me a real number without a deposit first. Russ walked the lot in East Sacramento, asked about our budget, and told us what a detached unit would actually run before he ever handed us paperwork. That’s why we hired them.”
Yolanda G. – East Sacramento
“Lodgewick converted our attached garage in Land Park into a JADU, which is a smaller unit attached to the main house, and handled everything from the drywall to the separate entrance. The permit process took longer than the framing, but they kept us updated the whole way. Final cost matched the written estimate to the dollar.”
Claudia G. – Land Park, Sacramento
“Russ and his team built a prefab ADU from Boxabl in our backyard in Natomas. The unit arrived on a truck and they had it set and connected in under two weeks. What sold us was the 365-Day Done Right Promise in writing, not just mentioned in conversation. We haven’t needed it, but knowing it’s on paper matters.”
Shannon S. – Natomas, Sacramento
“We had a home addition put on in the Pocket area and used Lodgewick after a neighbor recommended them. The job took eleven weeks, which is exactly what they told us on day one. Background-checked techs came in uniform every time, and we always knew who was on the property. The written guarantee came with the final walkthrough, not as an afterthought.”
Ernesto R. – Pocket, Sacramento
“I called on a Sunday afternoon with a question about our ADU foundation in South Land Park and a real person picked up. Not a phone tree, not a chatbot. That alone told me we’d made the right choice. The actual build quality backed it up. The James Hardie siding they recommended has held up perfectly through two Sacramento summers.”
Yolanda G. – South Land Park, Sacramento
Why Customers Trust Us
Every review above points back to the same commitments. We put the price in writing before any work starts, every time, no exceptions. We show up in the window we gave you. We leave the job site cleaner than we found it. We hand you a written guarantee on every build, and if the work fails within 365 days, we come back and make it right at no charge. That’s the 365-Day Done Right Promise, and it’s named that because it’s exactly what it sounds like. Homeowners in Sacramento don’t want vague reassurances. They want to know what a garage conversion costs, how long the ADU takes, and who will be standing in their backyard. Russ Delmar, Owner, personally walks every estimate, and a live person answers our phone 24 hours a day. Call (279) 256-1973 to talk through your lot, your budget, and your timeline. You’ll get a straight answer and a free estimate, with no pressure and no surprises.
Written by Russ Delmar, Owner at Lodgewick ADU Sacramento, serving Sacramento homeowners since 2010.


